According to given question,
Since an industrial loom weaves 0.128 meters of cloth in 1 seconds.
∴ an industrial loom weaves 1 meters of cloth in 1 / 0.128 seconds.
∴ an industrial loom weaves 25 meters of cloth in 1 x 25 / 0.128 seconds.
∴ an industrial loom weaves 25 meters of cloth in 25 / 0.128 seconds.
∴ an industrial loom weaves 25 meters of cloth in 195 seconds.