Four mat-weavers weave 4 mats in 4 days. At the same rate, how many mats will 8 mat-weavers weave in 8 days?
Aptitude
Chain Rule
Difficulty: Easy
Choose an option
-
A12 mats
-
B16 mats
-
C20 mats
-
D24 mats
Answer
Correct Answer: 16 mats
Explanation
Given data
- 4 weavers → 4 mats in 4 days
- Find mats made by 8 weavers in 8 days at the same rate
Concept / Approach
- Mats are proportional to (number of weavers) × (days), assuming identical constant rates.
Step-by-step calculation
Baseline output per (weaver·day): k = 4 mats ÷ (4 weavers × 4 days) = 4/16 = 0.25For 8 weavers in 8 days: mats = 0.25 × 8 × 8 = 16
Alternative check
Scaling factor = (8×8)/(4×4) = 64/16 = 4 ⇒ 4 mats × 4 = 16 mats.
Common pitfalls
- Adding weavers and days instead of multiplying.
Final Answer
16 mats