Chain Rule Questions
Practice Chain Rule MCQs with answers and explanations. Page 1 of 4.
Category
Aptitude
Topic
Chain Rule
Page
1 / 4
Mode
Practice
Questions
Open any question to view the answer and explanation.
In a dairy farm, 40 cows eat 40 bags of husk in 40 days. In how many days will one cow eat one bag?
Open
View answer
36 men can finish a job in 18 days. In how many days will 27 men complete the same work (same efficiency)?
Open
View answer
Three pumps, each working 8 hours per day, can empty a tank in 2 days. How many hours per day must four pumps work to empty the tank in 1 day?
Open
View answer
Four mat-weavers weave 4 mats in 4 days. At the same rate, how many mats will 8 mat-weavers weave in 8 days?
Open
View answer
A flagstaff 17.5 m high casts a 40.25 m shadow. Under similar conditions, what is the height of a building that casts a 28.75 m shadow?
Open
View answer
An industrial loom weaves 0.128 m of cloth per second. Approximately how many seconds are needed to weave 25 m of cloth?
Open
View answer
If 7 spiders make 7 webs in 7 days, then one spider will make one web in how many days?
Open
View answer
A camp has food for 120 men or 200 children. If 150 children have eaten, how many men can be fed with the remaining food?
Open
View answer
A wheel with 6 cogs meshes with a larger wheel with 14 cogs. When the smaller wheel makes 21 revolutions, how many revolutions does the larger wheel make?
Open
View answer
If the cost of x metres of wire is d rupees, what is the cost of y metres at the same rate?
Open
View answer
Six identical machines produce 270 bottles per minute at a constant rate. At this rate, how many bottles can ten such machines produce in four minutes?
Open
View answer
If a quarter kilogram of potatoes costs 60 paise, how many paise will 200 grams cost?
Open
View answer
A fort has food for 150 men for 45 days. After 10 days, 25 men leave. For how many days will the remaining food last?
Open
View answer
A man completes 5⁄8 of a job in 10 days. At this rate, how many more days are needed to finish the job?
Open
View answer
39 persons can repair a road in 12 days, working 5 hours per day. In how many days will 30 persons, working 6 hours per day, complete the work?
Open
View answer
In a work and time (chain rule) problem, 20 men can build a straight wall 56 meters long in 6 days. Under the same working conditions and efficiency, what length of a similar wall can be built by 35 men in 3 days?
Open
View answer
A certain number of men can finish a piece of work in 100 days. If there were 10 fewer men available, it would take 10 days more to finish the same work. How many men were there originally at the start of the work?
Open
View answer
If 36 men can complete a piece of work in 25 hours of continuous work, then in how many hours will 15 men complete the same work, assuming all men work at the same constant rate?
Open
View answer
Two men and seven boys can complete a certain piece of work in 14 days, while three men and eight boys can complete the same work in 11 days. At the same rates of work, in how many days will eight men and six boys together complete three times this amount of work?
Open
View answer
Seven spiders can weave seven complete webs in seven days. Assuming all spiders work at the same constant rate, in how many days will one spider weave one web?
Open
View answer
Practice smarter
Solve a few questions daily and revisit weak topics regularly to improve accuracy.