Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Take Free Test
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Take Free Test
Estimating and Costing Questions
According to IS (Indian Standard) method of measurement, what is the conventional order for booking dimensions?
In a base (house) drainage system, inspection pits or chambers (small manholes) should be provided at which locations?
Among common estimating methods (preliminary, plinth-area, cube-rate, detailed), which provides the most reliable and accurate cost estimate for a project?
Which of the following items is NOT typically measured in square metres (sq.m) under standard methods of measurement?
According to standard productivity norms, what is the expected out-turn for 12 mm thick cement plastering per mason per day (under normal site conditions)?
For a protective embankment with mean height d, side slopes S:1 (horizontal:vertical), and length L, what is the area of one sloping face?
In a plinth area estimate for buildings, which of the following items is NOT included within the plinth area measurement?
A steel reinforcing rod of diameter D is subjected to a tensile (bar) stress of 1400 kg/cm^2, and the permissible bond stress in concrete is 6 kg/cm^2. In reinforced concrete anchorage design, determine the required development (bond) length expressed as a multiple of the bar diameter D.
Select the correct prismoidal (Simpson’s) formula for volume between a series of equally spaced cross-sections: identify the proper weighting of odd and even intermediate areas relative to the first and last areas.
Identify which types of brickwork are measured in square metres (area measurement) rather than cubic metres in standard quantity surveying practice.
In reinforced concrete beams, the total length of a cranked (bent-up) bar that rises through a vertical distance d at a 45° angle, for a beam of effective length L, is taken as which of the following?
For a highway formation having a uniform gradient over a length where the existing ground also has a longitudinal slope, which earthwork computation methods are acceptable for calculating quantities?
As per common Indian Standard practice for domestic water-supply design, the peak (maximum) momentary draw-off per capita per minute is taken as which of the following values for the indicated number of users?
When preparing a detailed cost estimate for a civil project, which factors must be considered to ensure realistic rates and accurate quantities?
In method-of-measurement terminology, excavation exceeding 1.5 m in width and 10 sq.m in plan area but with a depth not exceeding 30 cm is termed as which type of item?
In building measurement, brick walls are measured in square metres (area measurement) when the wall thickness is which of the following?
In highway construction surveying, cross-sections for a road are typically taken at right angles to the centre line, at standard intervals (e.g., 30 m), at intermediate points where the gradient changes abruptly, and at the start-and-end points of curves. Which statement best captures this practice?
In building estimation, identify the item that is NOT included in the plinth area of a building measured at floor level to the outside of walls.
According to standard building services practice, what is the recommended installation height of a wash basin (sink) rim above the finished floor level?
For laying gullies, siphons, and intercepting traps in building drainage, the quoted cost generally includes which components of work?
1
2
3
4
5