Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Take Free Test
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Take Free Test
Industrial Engineering and Production Management Questions
PERT time estimation: sources for probabilistic activity time In PERT, the expected activity time is computed from three time estimates. Identify the inputs used to determine the probabilistic completion time for an activity.
Material handling equipment: device for lifting/lowering by a hook and chain/cable Identify the equipment used to raise or lower loads attached to a hook, via a retractable chain or wire rope. Choose the correct device.
Organisation structures: “military type” organisation is called what? In classical management terminology, the military-type structure follows a direct chain of command (unity of command). Choose the correct name.
Value engineering: meaning of “value” in design-to-cost analysis In value engineering, the goal is to maximize function for minimum cost. Select the best interpretation of “value”.
Work study charts: diagram that shows the physical path of men or materials A visual map of the route traced on a layout/plan to depict the movement during a task is required. Choose the correct chart/diagram name.
Incentive plans: formula for Rowan plan wages Let R = base time rate per hour, S = standard time for the job, and T = actual time taken. Using Rowan plan, write the total wages expression for the job.
Project planning: chart that shows both progress status and machine loading Identify the chart that simultaneously communicates job progress against time and the allocation/loading of machines or resources. Choose the correct chart type.
Work design: term for enriching job content for meaning and autonomy Definition focus: modifying work content to increase meaning and enjoyment by involving employees in planning, organisation, and control of their work. Choose the correct HRD term.
Wage incentive plans: plan with guaranteed minimum wage and bonus as fixed percentage of time saved Identify the incentive plan that guarantees a time rate and pays a bonus equal to a fixed percentage of time saved. Choose the correct plan.
PERT (Program Evaluation and Review Technique): time estimates basis Identify the time estimates used as the basis for PERT analysis. Select the correct option.
Systematic job improvement sequence: constituent elements Identify the comprehensive set of techniques that form a systematic sequence for job improvement in industrial engineering. Choose the best option.
Inventory control: definition of Economic Order Quantity (EOQ) Select what EOQ represents within inventory control theory. Choose the correct meaning.
Production system design: what the routing function optimizes Define the primary focus of the routing function when designing a production system. Choose the correct objective.
Compensation design: definition of job evaluation Identify what job evaluation objectively determines within an organisation. Choose the correct focus.
Value engineering: primary objective Identify the main aim of value engineering in product/process design. Choose the correct objective.
Materials handling equipment in large auto repair shops: statement validity Context: In a large automobile repair shop, elevating and moving heavy parts (e.g., complete engine assemblies, gearboxes) is done using an overhead crane and a fork-lift truck. Decide whether the statement is correct.
Production and operations management: main objective of a scientific (systematic) plant layout Consider the goals of a well-designed scientific layout in manufacturing and service facilities. Identify the most complete statement of objectives achieved by a scientific layout.
CPM time–cost trade-off: formula used to determine an activity’s cost slope In Critical Path Method (CPM) crashing, each activity has normal/crash time and cost data. Select the correct expression for the cost slope used to guide crashing decisions.
Work study scope: what does work study include in industrial engineering? Identify the complete composition of work study as used to improve productivity and cost. Choose the most accurate combination.
Production control functions: what does dispatching do? Match production control subfunctions (routing, scheduling, dispatching, expediting) with their roles. Identify the specific role of dispatching.
1
2
3
4
5
6
7
8
9